Project Cost and Site Management for Contractors

Contracting businesses lose money in the gap between what was quoted and what was actually spent, and the gap is usually discovered after the project ends. The system exists to close that gap while there is still time to act.

The gap between quote and spend

A project is quoted from a bill of quantities, then executed through subcontracts, material purchases and site labour. Each of these is tracked by a different person, and the three come together only in the finance department, usually a month late.

  • Material purchased against a project is not always attributed to it.
  • Subcontractor progress is certified separately from the client billing.
  • Site progress is reported verbally, so the schedule slips before anyone records it.

Where the system helps

The project record becomes the single place where cost, progress and billing meet.

  • Budget by phase, with committed and actual cost side by side.
  • Subcontractor progress certification linked to the payment schedule.
  • Material issue against a project, with excess flagged before it is consumed.
  • Client billing generated from certified progress rather than from memory.

Working on site

Site conditions determine what the system can ask of the people using it. Progress capture works on a phone, tolerates intermittent connectivity, and does not require the user to type more than a quantity and a photo.

  • Progress entry on a phone, with photo evidence attached.
  • Offline capture with synchronisation when the connection returns.
  • Daily report generated from the entries, not written separately.

Delivery scope

A contractor running several concurrent projects typically goes live in eight to ten weeks, starting with cost attribution because that is where the loss is largest.

  • Project and phase structure with budget.
  • Cost commitment and actual attribution.
  • Subcontractor certification and payment schedule.
  • Site progress capture and daily reporting.
FAQ

Questions we are asked

Can it handle projects priced in different currencies?

Yes. Each project can carry its own currency, with consolidation at the reporting level using a stated rate basis. This is common where materials are sourced from one country and the contract is signed in another.

Does it work without reliable internet on site?

Yes. Progress and material entries are captured locally and synchronised when a connection is available. The design assumes the connection will drop, rather than treating it as an exception.

How does subcontractor settlement work?

Progress is certified against the subcontract, which then drives the payment schedule. The certified quantity and the payment are linked, so a dispute can be traced to a specific certification rather than a total.

REGIONS

Delivery experience by region

The same delivery process runs in every region. Pick your region to see local cases, compliance requirements and the time difference.

Describe the current process first, then we scope the system

We are based in Chengdu and schedule calls in your working hours. Send the business scenario, the systems already in place and your timeline; one conversation is usually enough to judge feasibility and scope.

+86 173 6006 2006
Call us